Login EPL digital page
Log in Estonia Päevalehte How to read? | Site subscriber Paper | Create an account
Digi Package Bookings chemical |
The digital read-activate using the page order from the paper from the code reader. Find a sheet of paper tellimisarvelt personal code reader (code reader in the absence of contact Customer chemical Service) Go to http://www.digilehed.ee/lugejakood Log in to an existing account, or, failing that, a digital chemical to create a new digital account. Enter the code reader to the appropriate field. Verify your information and follow the instructions to start reading. Registration code reader is a single action. Next login you will gain access automatically.
Companies
28th August 2009 14:15
Power plant cooling manifold found a hole, reduce STT. Leakage was observed yesterday at 17:30 Estonian time around, and the reactor was to stand an hour later. Patching a leak must be stopped chemical and the reactor cooled.
Finnish Centre for Radiation Security said the problem is quite serious, but the environment does not cause immediate radiation chemical threat. "The collector has a diameter of about 80 centimeters chemical wide tube through which cooling water is delivered to the reactor. If the leak continues, it may prevent the reactor cooling," said center manager Heikki Reponen.
International chemical Atomic chemical Energy Agency (IAEA), risk assessments, according to the first or second degree failure. Threat assessment run higher, chemical amounting to seven - the seventh level corresponds to the Chernobyl disaster.
Apartment, 173,000
LOOK AT ALL OFFERS
No comments:
Post a Comment